For leaders

Exporting devices to the EU? What the CRA asks of you

By Manish SharmaPublished 6 min read

Indian makers who sell into the EU are covered by the Cyber Resilience Act even without an EU office. The Cyber Resilience Act applies to Indian companies whose connected products are sold in the EU, through their own brand or through an importer. Since 11 September 2026 they must report actively exploited vulnerabilities within 24 hours. From 11 December 2027, every product they place on the EU market must meet the essential requirements, with a technical file kept for at least ten years.

In short

  • The EU Cyber Resilience Act (CRA) covers Indian companies whose connected products are sold in the EU, even with no office there.
  • Since 11 September 2026, you must report flaws that attackers are actively exploiting within 24 hours. The full rules start on 11 December 2027.
  • Start now: name a reporting owner, keep a software list (SBOM) for every release, set each product's support period and plan the technical file.

The Act reaches you without an EU office

If your connected products are sold in the EU, the Cyber Resilience Act (Regulation (EU) 2024/2847) applies to you, even with no office there. The duty to report actively exploited flaws started on 11 September 2026. The rest applies from 11 December 2027: the security rules of Annex I, the technical file and CE marking, the EU's sign that a product meets its laws.

That leaves Indian exporters a little over a year to get their evidence in order. Firmware cycles are long, so the products you design this quarter are the ones that will meet the 2027 date.

Does it apply to you?

Probably, if anything you build reaches an EU buyer. The Act calls you the manufacturer if you develop or make the product and sell it under your name. If you build for an EU brand that sells under its own name, that brand is the manufacturer, and it will pass the duties to you through its contract.

Your importer cannot ignore it either. Under Article 19, an importer may put a product on the EU market only after making sure that you:

  • carried out the conformity assessment, the check that the product meets the rules
  • drew up the technical documentation
  • supplied the CE marking, the declaration of conformity and the user information

Expect your importer's questionnaire to follow those words.

The dates

The dates
DateWhat applies
10 December 2024The Act in force
11 June 2026Rules on notified bodies (Chapter IV)
11 September 2026Reporting of actively exploited vulnerabilities and severe incidents, also for products already on the market
11 December 2027Everything else: Annex I requirements, technical file, conformity assessment, CE marking

A product placed on the market before 11 December 2027 falls under the full rules only if it is substantially changed later. The reporting duty covers it from September 2026 either way.

Reporting since September 2026

When you learn that attackers are exploiting a flaw in your product, three reports follow:

  • an early warning within 24 hours
  • a notification within 72 hours
  • a final report no later than 14 days after a fix or mitigation is available

A severe incident follows the same 24 and 72 hours, with a final report within a month.

Reports go through the Single Reporting Platform of ENISA, the EU's cyber security agency, live since 11 September 2026. A maker with no base in the EU reports to the CSIRT, the national computer security team, of one member state. It is the state where its authorised representative acts for most of its products. Failing that, it is its importer's, then its distributor's.

The authorised representative is the person in the EU you appoint to act for you. Decide who it is before the first incident, not during it.

The clock starts when you become aware. Someone in your company must own the inbox where researchers and customers write. That person must have the authority to send a report on a Sunday.

What evidence to keep

The technical file described in Annex VII is the core. Plan for it to hold at least:

  • The cybersecurity risk assessment, updated during the support period (Article 13).
  • A software bill of materials (SBOM) "in a commonly used and machine-readable format", covering at least the top-level dependencies (Annex I, Part II).
  • How you chose the support period. It must be at least five years unless the product is expected to be in use for less. Its end date, at least the month and year, must be clear at the time of purchase.
  • Your coordinated vulnerability disclosure policy, which tells outsiders how to report a flaw, and a single point of contact for vulnerability reports.
  • Test reports and the EU declaration of conformity.

Keep the technical documentation and the declaration for at least ten years after the product is placed on the market, or for the support period if longer. Each security update must stay available for ten years after it is issued, or for the rest of the support period if longer.

Routers and security cameras need more

Routers, internet modems and switches are important products of class I in Annex III. So are smart home products with security functions, such as security cameras.

You can assess them yourself only by applying harmonised standards (EU standards that count as proof), common specifications or a European certification scheme in full. Otherwise a notified body, an approved outside assessor, takes part.

The harmonised standards the Commission requested under M/606 are still being written. Check whether one for your product has been cited in the Official Journal before you plan a self-assessment. If none has, book notified body time early.

The cost of doing nothing

The fines are the visible part. They reach EUR 15 million or 2.5% of worldwide annual turnover, whichever is higher, for breaching the essential requirements or the duties in Articles 13 and 14. Market regulators in each country can also order a fix or a withdrawal.

For most Indian exporters the earlier cost is commercial. An importer that has reason to believe a product does not conform must not place it on the market. So the order stops at the importer's desk long before any regulator writes to you. Expect EU buyers to put the Act's own words into their supplier questionnaires: SBOM, support period and vulnerability handling.

A plan for the next twelve months

  • This quarter: name the reporting owner, appoint or confirm an authorised representative, and publish a disclosure policy with a contact address.
  • Next quarter: produce an SBOM for every release you ship to the EU and decide the support period per product line.
  • By mid 2027: run the risk assessment, map your evidence to Annex I, and decide between self-assessment and a notified body for class I products.
  • Before 11 December 2027: complete the technical file, the declaration of conformity and the user information of Annex II.

Keeping CRA evidence release by release

FDIE by Magdox fills much of the CRA paperwork from each analysed release, and people finish it. The app prepares the Annex VII technical file, the declaration of conformity and its simplified form, and the Annex II user information. An owner signs with a two-step code.

The Article 13 risk assessment starts from the newest release. It needs sign-off by an owner other than the person asking. On the Business plan, Article 14 cases run the 24 hour, 72 hour and 14 day clocks, and a person submits on ENISA's platform.

Of the 22 Annex I provisions in the app, the device checks decide 8 and help with 4. Product data answers 4, and 6 need your documents. That is evidence and gap finding, not certification. A notified body or a market regulator makes the final call.

Questions

Does the Cyber Resilience Act apply to Indian manufacturers?

Yes, when their products with digital elements are made available in the EU. An EU importer must also check that the manufacturer did the conformity assessment and drew up the technical documentation before it places the product on the market.

What are the key Cyber Resilience Act dates?

In force since 10 December 2024. Rules for notified bodies from 11 June 2026, reporting of actively exploited vulnerabilities and severe incidents from 11 September 2026, and everything else from 11 December 2027.

Where does a manufacturer outside the EU send its reports?

Through ENISA's Single Reporting Platform, as Article 14(7) sets out. The report goes to the CSIRT of the member state where its authorised representative acts for most of its products, or failing that its importer, then its distributor.

How long must CRA evidence be kept?

The technical documentation and the EU declaration of conformity must be kept for at least ten years after the product is placed on the market. If the support period is longer, they are kept for the support period.

What are the fines under the Cyber Resilience Act?

Up to EUR 15 million or 2.5% of worldwide annual turnover, whichever is higher, for breaching the essential requirements or the obligations of Articles 13 and 14. Lower ceilings apply to other obligations.

Sources

  1. Regulation (EU) 2024/2847, the Cyber Resilience Act (EUR-Lex) eur-lex.europa.eu
  2. European Commission, Cyber Resilience Act reporting obligations digital-strategy.ec.europa.eu
  3. ENISA, The CRA Single Reporting Platform is launched (11 September 2026) enisa.europa.eu
  4. European Commission, Cyber Resilience Act standardisation digital-strategy.ec.europa.eu

Product and project names are trademarks of their owners, used only to identify the public firmware, software and standards discussed. MAGDOX is not affiliated with or endorsed by them.

  • For leaders

    Which device security rules apply where you sell, and when

    Device makers who sell in several markets face many rules that ask for overlapping evidence. Four families of these frameworks are law for some products. In India they are ER-01 for CCTV cameras and NCCS ITSAR for routers. In the EU they are the Cyber Resilience Act, and EN 18031 under the Radio Equipment Directive. The rest are voluntary baselines that buyers and labels use. Across the 720 provisions FDIE tracks in 13 of them, a firmware analysis decides 38 on its own and helps with 180. The other 502 need product data or documents, tests and procedures from people.

    · 7 min read

  • For leaders

    Selling devices in India: what you must now prove

    Indian device makers now have to prove security in writing, model by model. CCTV cameras sold in India need an ER: 01 security test report for BIS registration since 9 April 2025. IP routers and Wi-Fi CPE need NCCS security certification under MTCTE since mid 2024. On top of that, CERT-In expects incidents reported within six hours and recommends SBOMs in procurement. Exporters to the EU must report actively exploited vulnerabilities under the Cyber Resilience Act from 11 September 2026.

    · 6 min read

  • For engineers

    ETSI EN 303 645 or EN 18031: one evidence base for both

    Consumer IoT sold in Europe is judged against two overlapping documents. ETSI EN 303 645 is a voluntary consumer IoT baseline. EN 18031-1, -2 and -3 are the harmonised standards for the Radio Equipment Directive's security requirements. Those apply from 1 August 2025 until 11 December 2027, when the Cyber Resilience Act takes over. Most ETSI provisions on passwords, updates, storage, communication and attack surface have an EN 18031 counterpart, and the same firmware evidence feeds both. They differ on legal role, scope, vulnerability handling, privacy and three restrictions in the Official Journal.

    · 8 min read

Find out what the lab would flag in your firmware

A 45-minute call with our team. Bring one firmware image.

Request access